Service 03 · BIM coordination

BIM coordination and clash detection for U.S. construction teams

We integrate architectural, structural and MEP models in one federated environment and resolve clashes before construction, so your project reaches the field with fewer RFIs, changes and delays.

Definition

What is BIM coordination?

BIM coordination is the process of combining the architectural, structural and MEP models of a project, detecting clashes between them and resolving those conflicts before construction. It runs in a common data environment where every discipline works from the same, current model.

Coordination goes beyond running a clash test. It means judging which conflicts matter, proposing practical solutions and tracking each decision until it is closed.

At a glance

Deliverables
Federated model, clash reports and resolution log
Disciplines
Architecture, structure and MEP
Software
Navisworks, Revit, Tekla, Autodesk Construction Cloud
Clients
GCs, design teams, owners and trade contractors
Hours
U.S. business hours, from Panama (UTC−5)

What is included

What our BIM coordination service includes

A coordination process sized for complex projects with many consultants and trades.

01

Model review

Review of architectural, structural and MEP models, design criteria and Level of Development.

02

Clash detection

Hard, soft and workflow clashes identified and prioritized by their impact on construction.

03

Federated model

All disciplines integrated in one model with version control and change tracking.

04

Technical solutions

Proposed reroutes and layout adjustments, coordinated with engineers and designers.

05

Clash reports

Clear, actionable reports with screenshots, locations and the responsible party for each item.

06

Decision log

Tracking of open issues and documentation of every approved resolution.

How we work

How a BIM coordination project runs

A repeatable cycle that keeps every stakeholder working from the same information.

  1. 01
    Model intake

    We receive and review each discipline’s model and check it against the coordination criteria.

  2. 02
    Integration

    We federate the models in a collaborative environment such as Autodesk Construction Cloud.

  3. 03
    Clash analysis

    We run clash tests, filter noise and rank conflicts by risk.

  4. 04
    Resolution

    We propose solutions and validate them with your team in coordination meetings.

  5. 05
    Coordinated model

    We deliver the final model and documentation ready for construction.

When you need it

When BIM coordination should start

The earlier, the cheaper. Starting coordination in design development lets clashes be solved on screen instead of in the field. We also join projects in construction documents or already under construction to clear conflicts and recover schedule.

It is most valuable on multifamily and commercial buildings, industrial facilities, healthcare and education projects, and any job with several consultants and trade contractors.

Software and standards

  • Navisworks
  • Revit
  • Tekla Structures
  • Autodesk Construction Cloud
  • Rhino and Grasshopper

We work to recognized BIM practice and the project’s BIM execution plan, with Level of Development defined per discipline and coordination criteria agreed with your team.

Projects

Projects coordinated in BIM

Steel and concrete structure of the Plaza 25 commercial center
Commercial

Plaza 25

Commercial center with a combined steel and concrete structure, designed for heavy loads and an efficient build.
Rebar detailing model of the Mariano Bula Stadium
Institutional

Mariano Bula Stadium

Rebar shop drawings for a stadium in Colon, Panama: foundations, pile caps, grade beams and anchorage.
Boulevard Santiago project: steel rigid and braced frames
Commercial

Boulevard Santiago

Shopping center that combines contemporary architecture with a durable, safe structural solution.

FAQs

Questions about BIM coordination

Architecture, structural engineering and MEP systems, including electrical, mechanical, plumbing, fire protection and HVAC.

Yes. We can join at an intermediate or advanced stage to resolve conflicts and improve constructability.

Coordinated models, clash detection reports, resolution logs and the final coordination documentation.

No. It connects the work of designers and engineers so the design is technically aligned and buildable. Design responsibility stays with them.

Navisworks for clash detection, Revit and Tekla Structures for modeling, and Autodesk Construction Cloud for collaboration.

Engineer reviewing the start of a structural project

Let’s talk about your next project

Tell us what you are building and where the project stands. One of our engineers will reply with the scope and the next steps.